2-on-2-off Schedule: 12-Hour Shifts, Summarised Accounting and Pay
Team5 min read
How to set up a 2-on-2-off schedule in Russia: 12-hour shifts, summarised working time accounting, the reference period, overtime, night and holiday hours, an example.

A 2-on-2-off schedule means an employee works two shifts in a row and then rests for two days. The number of working days varies from month to month, so the employer usually introduces summarised accounting: actual hours are compared with the norm for a month, quarter or year rather than for each week.
Example: a pick-up point open seven days a week
An order pick-up point on the outskirts of Yekaterinburg is open every day from 9:00 to 21:00. The owner, Irina, hires two employees — Anna and Olga — and puts them on 2-on-2-off. The point runs with no days off, and each employee has predictable rest. But to stay within the law and not overpay, Irina needs to do a few things.
What to put in writing
- Internal work rules. State that shift work and summarised accounting apply at the point, and specify the length of the reference period.
- Employment contracts. The schedule differs from a standard five-day week, so it goes into the contract. A template is in employment contract: template.
- Shift roster. Approve it and show it to the employees no later than a month before it starts.
- Signatures acknowledging it.
- Timesheet. Record the actual hours of every shift.
What a week looks like
| Mon | Tue | Wed | Thu | Fri | Sat | Sun | |
|---|---|---|---|---|---|---|---|
| Anna | 12 | 12 | — | — | 12 | 12 | — |
| Olga | — | — | 12 | 12 | — | — | 12 |
The following week the shifts shift, and in the end each works roughly half the days of the month.
Summarised accounting in brief
Article 104 of the Labour Code allows hours worked to be compared with the norm over a reference period. It cannot exceed a year, or three months where working conditions are hazardous or dangerous.
| Period | Pros and cons |
|---|---|
| Month | Easy to calculate, but overtime occurs more often |
| Quarter | Long and short months balance each other out |
| Year | Maximum flexibility, overtime calculated once a year |
The norm is taken from the official working-days calendar for a 40-hour week.
One-minute calculation: how much extra to pay Anna
Irina chose a quarterly reference period. Say the quarterly norm is 480 hours. Anna worked 46 shifts of 11 net hours — 506 hours. The extra 26 hours are overtime.
Pay: the first 2 hours at least time and a half, the remaining 24 at least double. At a rate of 400 ₽ an hour that's 2 × 600 + 24 × 800 = 20,400 ₽ on top of her pay for the quarter.
Overtime is limited by law: no more than 4 hours over two consecutive days and 120 hours a year. So it's worth building the roster so that hours almost match the norm by the end of the period.
Rest within and between shifts
- Each shift includes a meal and rest break of 30 minutes to 2 hours. It is usually not counted as working time.
- Once a week — at least 42 hours of uninterrupted rest.
- Two back-to-back shifts are not allowed.
Nights and holidays
- 22:00 to 6:00 counts as night time. The premium is at least 20% of the hourly rate for each such hour.
- If a public holiday falls on a scheduled shift, it is paid at least double, or at the single rate plus a day off — the employee chooses.
Mistakes that come up all the time
- Long shifts without summarised accounting — and technical overtime every week.
- The roster shown to employees three days ahead instead of a month.
- Night hours paid as day hours.
- Overtime calculated monthly when the reference period is a quarter.
- Holidays on the roster not taken into account in the calculation.
How it works in Mestra
Each employee's profile in Mestra stores their schedule, and the team calendar shows who is on shift. The workload widget on the analytics dashboard highlights imbalances, and bookings and meetings can only be assigned to people who are working that day.

- Schedules in employee profiles.
- Branches and places — shifts by location.
- Team workload — on the analytics dashboard.
FAQ
How many hours a month does 2-on-2-off come to?
With 12-hour shifts, usually 168 to 192 hours, depending on how many shifts fall in the month. That's why summarised accounting is a must.
Can I do without summarised accounting?
Only if shifts are short and the week doesn't exceed 40 hours. With 11–12-hour shifts you need it.
How do I pay for a holiday on the roster?
At least double, or at the single rate plus a day off — whichever the employee chooses.
Who draws up the roster?
The employer, taking into account the opinion of the employees' representative body if there is one, and communicates it to employees a month ahead.
Bottom line
A 2-on-2-off schedule works well for a business open seven days a week if everything is in order: summarised accounting with a clear period, a roster a month ahead, a timesheet of actual hours and fair pay for overtime, nights and holidays. How to record hours is covered in the timesheet.
Mestra — 15 days free, no bank card required: set employee schedules and see the team's workload in the calendar.
Sources: Labour Code of the Russian Federation (Arts. 99, 103, 104, 108, 110, 152, 153, 154), Government Decree No. 554. This article is not legal advice.