MestraMestra
All posts

Kanban Board and Tasks in a CRM: Running Projects by Stage, Deadline and Owner Without a Separate System

Management6 min read

How to manage tasks and projects in a CRM: work stages, deadlines for each stage, responsible people, a kanban board and ready-made industry process templates.

M
Mestra Team
Kanban board and tasks in a CRM

Many companies keep clients in a CRM but the work for them in a separate task manager or in chats.

As a result, the manager can't see what stage an order is at, who's holding it up and why deadlines were missed.

Let's look at how to set up tasks and projects right inside the CRM, so the client, the deal and the work on it are all in one place.

One-minute plan

  1. List the steps of a typical order from request to payment.
  2. Set a deadline and a responsible person for each step.
  3. Build a kanban board: one column = one process step.
  4. After a week, see which column cards pile up in — that's your bottleneck.

What a kanban board is

A kanban board is a way of showing work in columns. Each column is a stage; each card is an order or an assignment. Cards move from left to right as work progresses.

The possible statuses on a kanban board depend on the process. For a renovation, for example: "Measurement", "Estimate", "Contract", "Works", "Handover", "Payment".

The kanban method originated in the Toyota Production System as a way to manage the flow of work "just in time". In 2010, David Anderson described its use for office and knowledge work in his book "Kanban", and since then kanban boards have become the standard for sales, service and development teams.

The stages of a task-process aren't hard-coded: you add, remove, change and rename them and save the set of stages as a template. You can create several templates — one for each service.

How to build a kanban board in 10 minutes

  1. Describe the process. Take your last completed order and list the steps it went through.
  2. Create the columns. One step, one column. 4–7 columns are usually enough.
  3. Add cards. Each current order is one card in the right column.
  4. Assign owners and deadlines to each card.
  5. Agree on the rules: who moves cards and when, and what "done" means.

Limiting work in progress

The main rule of kanban is to limit the amount of work in each column. If the "Estimate" column already holds five orders, a new one isn't taken on until space frees up. That way problems become visible immediately: the team doesn't pile up dozens of started tasks, but finishes them.

Column Limit What to do when exceeded
Measurement 6 Redistribute site visits
Estimate 5 Bring in a second estimator
Works 4 crews Push back the start of new projects

Online kanban board: separate tool or CRM

Separate tool Kanban in the CRM
Link to the client and conversations No — you have to search another system The card is linked to the client
Money and invoices Separate In the same system
Data entry Duplicated Once
When it suits Internal team projects Work on client orders

If you need the board for client work — orders, services, deals — it's more convenient to keep it in the CRM. For internal projects without clients, a separate free online kanban board will do.

Task or project

Simple task Task-project
Example Call the client back Apartment renovation, tour preparation, course of treatment
Steps None Several named steps
Deadlines One An overall deadline and one for each step
Responsible people One A person or group for each step
Step back Not needed Can go back to the previous step

Process examples by industry

Industry Process steps
Real estate Request → Matching → Viewing → Reservation → Deal
Clinic Booking → Appointment → Treatment → Follow-up visit
Construction and renovation Measurement → Estimate → Contract → Works → Handover
Education Request → Trial lesson → Contract → Training
Travel Enquiry → Selection → Booking → Documents → Trip

Why a separate task manager is often unnecessary

  • Work gets separated from the client — you have to look for the conversation elsewhere.
  • Deadlines and money live separately — it's unclear whether a stage has been paid for.
  • Employees duplicate data in two systems.

Tasks and stages in Mestra

How it works in Mestra

  • A project inside a task: the client and the product or service are linked to it, and the work goes in stages.
  • Named steps, an overall deadline and a deadline for each step.
  • A responsible person at every stage — one employee or a group; notes can be added to stages, and the task can be sent back to the previous stage.
  • Kanban board with stage columns.
  • Ready-made industry process templates — choose your industry and everything is already set up.
  • Permissions — each person sees their own work, the manager sees the whole board.

More on roles in our article roles and permissions in a CRM.

Related reading: task timeline.

FAQ

Does Mestra have a kanban board?

Yes. You can view work as a board with columns for the process stages.

Can different stages have different owners?

Yes. Each stage has its own responsible person or group of employees, with its own deadline.

Is there a Gantt chart?

No. For most service companies, stages, deadlines and a kanban board are enough. If you need a Gantt chart for complex construction projects, you can keep it in a separate tool.

Do stages have to be set up from scratch?

No. Mestra has ready-made industry templates that you can adapt to your needs.

Bottom line

When stages, deadlines and assignments live in the same system as clients, the manager sees all the work at once and notices delays before the client does.

In Mestra, any task can become a project with stages, deadlines and responsible people, and the kanban board shows the picture in a second.

Keep reading

Sign up for a demo and see it in action

Niche analysis with ready scenarios and fields

Sign up for a demonstration

Leave your contacts and we will schedule a short demo.

We use cookies

Cookies keep Mestra running, remember your preferences and help us understand how the site is used. See our Privacy Policy, Terms of Service and Consent Form.