MestraMestra
All posts

Administrator Checklist: Sample for Opening, the Shift and Closing

Management5 min read

A ready administrator checklist for a salon, clinic, restaurant or studio: what to check at opening, during the shift and at closing, plus 8 mistakes.

M
Mestra Team
Administrator checklist with completion marks — Mestra article

A checklist is not for controlling people but for not keeping everything in your head. In the peak hour it is exactly what has been done a thousand times that gets forgotten.

Administrator checklist: opening and closing items

The one-minute calculation

The opening list has 14 items, each taking 2 minutes. There are 22 shifts in a month. The figures are illustrative.

Line Calculation Result
Per shift 14 × 2 min 28 min
Per month 28 × 22 616 min ≈ 10 h 16 min

These 10 hours turn into a predictable morning: without a list some items are skipped, and you learn about it from client complaints. The duties behind the list are described in the administrator job description.

Opening checklist

  • Turn on the lights, equipment, music, climate control.
  • Check the cleanliness of the entrance area and the hall.
  • Check the specialists' workplaces or tables.
  • Check the till: terminal, receipt roll, change.
  • Open the schedule and go through the day's bookings.
  • Confirm visits that have no confirmation.
  • Check consumables and testers.
  • Read the previous shift's notes.
  • Check which staff members are in.
  • Check online booking and incoming messages.
  • Check the day's promotions and prices.
  • Check sanitary areas: toilet, sinks, soap.
  • Check the readiness of those who greet clients.
  • Note the opening time in the report.

Shift checklist

  • Greet every client within a minute.
  • Add comments to the client card after the visit.
  • Do not leave incoming messages unanswered for more than [15 minutes].
  • Watch for lateness and reschedule bookings.
  • Record complaints and pass them to the manager the same day.
  • Offer a repeat booking at the exit.
  • Watch the queue and waiting in the hall.
  • Check the cleanliness of common areas every hour.
  • Do not give discounts above your limit without approval.

Closing checklist

  • Ring up all clients, reconcile the till and the terminal.
  • Close the shift on the till and save the report.
  • Write down the consumables that are running short.
  • Check tomorrow's schedule and confirm visits.
  • Leave notes for the next shift.
  • Tidy the workplaces and take out the rubbish.
  • Switch off equipment and lights, lock the premises.
  • Send the report to the manager.

How to make your own checklist

Take three sheets and write down everything you do during a shift, then delete what happens by itself. Keep the items that are often forgotten. For each one, formulate the action and the sign of completion: "check the till" is better replaced by "reconcile the till and terminal, write down the balance". If there are more than 15 items, split the list into stages.

Discuss the checklist with the administrators themselves. They know which items are redundant and will use the list more willingly if they helped to make it.

Eight mistakes

The list is too long. Nobody looks at 60 items.

Vague items. "Tidy up" means nothing.

No sign of completion. The tick is put without looking.

Paper in a drawer. The list is never taken out.

Nobody responsible for updating. It goes stale within half a year.

Control without meaning. Workers tick boxes for the manager's sake.

No final check. The manager does not see the shift report.

One list for all locations. Each location has its own features.

How it works in Mestra

You write the lists yourself, and in Mestra they turn into recurring tasks: opening, shift and closing are created on a schedule and assigned to the administrator on duty with a reminder. The manager sees completion in reports by employee, and client bookings, comments and payments are in the same cards. We wrote more about organising team work in Team management.

Questions and answers

How many items should a checklist have?

No more than 10–15 per stage. Longer lists stop being read.

Is a checklist needed if there is a job description?

Yes. The description sets out duties, and the checklist reminds you of actions at the right moment.

Paper or electronic?

Any format will do if it is visible at the moment of work and the result is saved.

Who makes the checklist?

The manager together with the administrators. That way it is closer to reality.

How to check completion?

Through the shift report and spot checks, not strict control of every item.

How often should it be updated?

Once a quarter and with any process changes.

Summary

An administrator checklist helps you forget nothing: a short list of concrete actions for opening, the shift and closing. Mestra turns such lists into tasks on a schedule with a report for the manager. The first 15 days are free, no card required.

Sources:

Keep reading

Sign up for a demo and see it in action

Niche analysis with ready scenarios and fields

Sign up for a demonstration

Leave your contacts and we will schedule a short demo.

We use cookies

Cookies keep Mestra running, remember your preferences and help us understand how the site is used. See our Privacy Policy, Terms of Service and Consent Form.