Work Contract: Sample, What to Write About Deadlines, Price and Warranty

Documents and deals8 min read

How to draw up a work contract in Russia: deadlines under Article 708, price and estimate, a sample with advance and penalty, acceptance, warranty, 8 mistakes.

M
Mestra Team
Work contract with an estimate and a signature — Mestra article

If after the work there remains a thing or a result that can be accepted and checked, it is most often a work contract. A renovated office, a finished website, installed ventilation. If what is paid for is time and actions, a service contract fits better, and then a service contract is what you need.

Work contract: stages, price and acceptance by certificate

The one-minute calculation

Office renovation: 480,000 ₽ of work and 220,000 ₽ of materials. The figures are illustrative.

Line Calculation Amount, ₽
Work per estimate 480,000
Materials per estimate 220,000
Total 480,000 + 220,000 700,000
Advance 30% 700,000 × 30% 210,000
Balance after the certificate 700,000 − 210,000 490,000

The contractor delivered 14 days late. If the contract provides a penalty of 0.1% per day, that is 700,000 × 0.1% × 14 = 9,800 ₽. The parties choose the percentage, and a court may reduce an obviously disproportionate amount (Article 333).

Work contract, services, household work contract

The kind of contract decides which rules apply.

Contract What is paid for Feature
Work contract The result Start and end dates are mandatory (Article 708)
Service contract The actions The result is not guaranteed, the process matters
Household work contract A result for an individual The customer is a consumer, so consumer protection law is added

When the customer is a private person rather than a company, also open Apartment renovation contract.

What to write in the contract

Clause What to write Why
Subject Which work and which result, volume, requirements So the customer gets exactly what they expected
Deadlines Start, end, stages (Article 708) The law requires a start and an end date
Price A firm price or an estimate (Article 709) Otherwise a dispute over cost
Payment Advance, stages, final settlement By default payment is made after handover (Article 711)
Materials Who buys, at what price A frequent source of conflict
Acceptance Who accepts and within how many days So acceptance does not drag on
Warranty Period and conditions Without it the law's general periods apply
Liability Penalty, compensation for losses Protection in case of breach
Termination Grounds and procedure An exit without a scandal

Work contract: sample

WORK CONTRACT No. [number] [city], [date]

[Contractor name], TIN [number], represented by [position, full name], acting under [the charter], hereinafter the "Contractor", and [customer name], TIN [number], represented by [position, full name], acting under [the charter], hereinafter the "Customer", have agreed as follows.

1. Subject. The Contractor performs the work: [description, volume, requirements for the result], and the Customer accepts the result and pays for it. The scope of work and the cost are given in the estimate (Appendix No. 1).

2. Deadlines. Work starts on [date] and ends on [date]. Stages: [list with dates].

3. Price and payment. The price of the work is [amount] ₽, [22% VAT / without VAT]. The Customer pays an advance of [… %] within [period] after the invoice is issued, and pays the balance within [period] after the certificate is signed.

4. Materials. [The Contractor / the Customer] provides the materials according to [the estimate / the list].

5. Acceptance. When the work is finished the Contractor sends the Customer a certificate. Within [5] business days the Customer signs the certificate or sends written remarks. The Contractor fixes defects at their own expense within [number] days.

6. Warranty. The Contractor guarantees the quality of the work for [period] from the date the certificate is signed.

7. Liability. For late work the Contractor pays a penalty of [0.1]% of the price for each day. For late payment the Customer pays [0.1]% of the unpaid amount for each day.

8. Changes and termination. Changes of volume and price are made by a supplementary agreement. The Customer may withdraw from the contract by paying for the part actually performed.

9. Disputes. A claim, a reply period of 30 calendar days, then the court [name].

10. Details and signatures of the parties.

What the contractor must warn about

If the contractor sees that material supplied by the customer is unfit or that an instruction will lead to defects, they must say so at once (Article 716 of the Civil Code). If they stay silent, a reference to "the customer told me to" no longer saves them.

The customer has a duty to cooperate as well: open the site, hand over documents, approve extra work quickly. If they do not, the deadlines shift and the fault no longer lies with the contractor (Article 718).

Acceptance and warranty

The customer inspects the result and accepts it, naming defects at once (Article 720). If there are defects, the customer chooses one of three: demand a free fix, a proportional price reduction, or fix it themselves and recover the costs (Article 723). Acceptance is best formalised by a written certificate signed by both parties.

If no warranty is agreed, quality claims have one year, and two for buildings (Article 725). It is better to write the warranty period straight into the contract.

Can the customer withdraw

Yes, until the work is handed over. But they will have to pay for the part already done and compensate the contractor's losses from the termination (Article 717). The contractor cannot leave as easily: without fault on the customer's side, withdrawal turns into losses for them.

Eight mistakes

No start or end date. The law requires both (Article 708).

The scope of work is described in one word. "Renovation" stretches any way you like, while an estimate with line items fixes the boundaries.

Price without an estimate clause. An approximate price and a firm one are different things; state which one you have.

It is unclear whose materials. The customer buys, and the defect is looked for in the contractor's work.

No procedure for approving extra work. New items appear while the contract is silent.

The certificate was signed orally. A month later it turns out there were complaints, but nobody wrote them down.

The warranty is not written. Then a dispute follows the law's general periods.

One copy lacks a signature. Check that each party kept a signed sheet.

How it works in Mestra

You prepare the contract and estimate yourself or with a lawyer: Mestra has no contract templates. But work under a contract does not fall apart between chats and spreadsheets.

The deal is run as a task with stages: "Contract signed", "Advance received", "Work done", "Certificate signed", "Final settlement". Each stage has an owner and a deadline, and the contract, estimate, photos and certificates are attached in the "Files" tab. Correspondence with the customer from messengers sits in the same card, so a month later you do not need to search for "where did he approve the extra work". Invoices are created from the card, and an invoice's status follows real payments.

For companies in construction and renovation this means order by stages and a clear picture: what is handed over, what is paid, and what is hanging.

Questions and answers

Which terms are mandatory?

The subject and the deadlines: Article 708 of the Civil Code requires the start and end dates. It is also better to name the price, otherwise it is set by ordinary prices.

How does a work contract differ from services?

In a work contract you pay for the result, in services for the actions. If the outcome can be accepted and checked, it is more often a work contract.

Can subcontractors be used?

Yes, unless the contract forbids it. As a general rule the contractor answers to the customer for the subcontractor's actions (Article 706).

When to pay: before the work or after?

As you write it. If the contract says nothing, the customer pays after the final handover of the result (Article 711). More often an advance and stages are agreed.

What if the contractor missed the deadline?

Record the delay in writing, send a claim and use what the contract says: a penalty, withdrawal or compensation of losses.

Is an estimate needed?

In construction and renovation an estimate is needed almost always: it shows volume and price. Without it the price is set by the general rules, which is rarely favourable, so attach an estimate.

Summary

A good work contract has a result, two dates, a price or an estimate, a clear acceptance and a written warranty. The rest protects against conflicts. Mestra keeps the contract, estimate and certificates next to the client and the work stages, and shows payment by real receipts. The first 15 days are free, no card required.

Sources:

Keep reading

Sign up for a demo and see it in action

Niche analysis with ready scenarios and fields

Sign up for a demonstration

Leave your contacts and we will schedule a short demo.

We use cookies

Cookies keep Mestra running, remember your preferences and help us understand how the site is used. See our Privacy Policy, Terms of Service and Consent Form.